Destroying The Raw Material For Cement

20181210raw material samples to be got tested, if any mdiii15921 manual 6 procedure to be followed for destroying deshaping recycling the product that with the provision laid down in is 11767 2005roken pieces and offcuts of asbestos cement material shall be collected and disposed of in a manner which does not generate dust.