Short Note On Sludge Drying Bed

2018917a hard concrete or blockwork splash pad should be provided below the inlet to each drying bed to ensure that incoming sludge does not scour the sand bedo achieve this objective, it is suggested that the splash pad should extend at least 0m on either side of the inlet pipe and at least 0 m beyond it.