Silver Ore Mine Canada

Current process plant design is based on an annual plant throughput rate of 365,000 t of runofmine rom ore from the mine based on a 365 days per year operationaily nominal throughput rate is 1,000 t and the process is designed to enable the production of a leadsilver and zinc concentrate for.