Pcc Bed

Check polythene sheet is laid over pcc bedheck the concrete slump maximum slump should be 75mm check the thickness and level of pcc before casting by putting steel pegs in concreting area or putting a level pillar of fresh concrete at a suitable distanceheck the finish level of pcc by thread fixing with nails in formwork.